SCADA Operation for WTC or SICS Controller (SE-P-07335)
Purpose
To provide instruction on the Siemens Gamesa Wind Park Supervisor (WPS) software system, and High Power Park Pilot (HPPP). This will enable the participants to properly identify and describe Wind Turbine Generator (WTG) components and WPS systems architecture, access the WPS system, navigate the various menus and sub-menus, retrieve daily and monthly reports, and initiate fault diagnosis.Objectives
Upon completion of the course the participants are able to:Describe the purpose, composition, and operation of each major system in a Siemens Gamesa WTG with SICS or WTC3 Controller
Explain the function and modes of operations of a Siemens Gamesa WTG with a SICS or WTC3 Controller
Identify and discuss the purpose and operation of the components that comprise a Supervisory Control and Data Acquisition (SCADA) system
Discuss the basic functions of the Web Wind Park Supervisor System (WPS) and High Power Park Pilot
Demonstrate how to log into WPS and perform the following functions:
- - Navigate the menus and Sub menus
- - Refine the reporting criteria
- - Develop the required output
- - Analyze and interpret results
- - Perform basic fault recognition and initiate diagnostics
Theory / Practice
67% / 33%
Who should attend?
The course is intended for 3rd party customers who operate a Wind Park that contains Siemens equipment.Prerequisites
NoneNotes
Validity
No Expiry
Course duration
3 daysPrice
Cancellation fee
Export control
AL-Number: N/AECCN: N/A
Course dates
The following dates are available
Sorry, currently no course events are available.
Contact person:
Siemens Gamesa Training Center - North AmericaPhone:
E-Mail: wstcnorthamerica.us@siemensgamesa.com
Address:
Siemens Gamesa Training Center - North America7415 Emerald Dunes Drive, Suite 100
FL 32822 Orlando
United States of America
Phone: