Onshore Operation During Installation. (SE-P-09412)
Purpose
The overall purpose of the course is to enable the technician to operate the Onshore Siemens Gamesa Wind Turbine during installation in a safe manner using the relevant documentation and selected tools provided by SGRE.Objectives
Upon completion of the course the participants should be able to- - Able to navigate documentation system and find relevant documentation
- - Describe turbine design
- - Explain interconnection between the hydraulic and mechanical systems of the turbine
- - Describe the complete installation process
- - Perform LOTO related to the installation process and safety documentation
- - Demonstrate understanding of the procedures during operation and erection of the tower including but not limited to torqueing and bolt tensioning, working with EIPs, securing the wind turbine and setting it to idle mode.
Who should attend?
The course is intended for SGRE employees and 3rd parties performing Onshore on-site installation, according to the Onshore Assembly Manual and the SGRE Safety GuidelinesPrerequisites
SE-P-85400 SWP General Electrical AwarenessSE-P-05600 Electrical Zero Energy Training OR SE-P-05200 US Regional Safety Compliance Training
- - Recommended:
Course duration
3 daysPrice
Export control
AL-Number:ECCN:
Course dates
The following dates are available
Sorry, currently no course events are available.
Contact person:
Siemens Gamesa Training Center - North AmericaPhone:
E-Mail: wstcnorthamerica.us@siemensgamesa.com
Address:
Siemens Gamesa Training Center - North America7415 Emerald Dunes Drive, Suite 100
FL 32822 Orlando
United States of America
Phone: